Overloads are mainly installed at formation stations, section stations, and entry and exit signal locations at stations with cargo inspection operations. Used to determine if a railroad car is overloaded and off-loaded. It is an important equipment for the National Railway Group to control the safety of railway freight. The product is divided into normal over-deflection load applicable to trains of 60km/h and high speed over-deflection load of 100km/h.
Email:huoanhr@yunda-tec.com